
SOLAR PARK
216,00 MWp Project is planned to be installed in the Khmelnytskyi region.
Total capacity 216,00 MW DC /180,00 MW AC with option of adding BESS 150,00 MWh AC
Expected net annual energy production 232 848,0 MWh
Annual energy yield 1078 MWh/year
Connection point substation 330/110 / 35 kV (substation to be build – 4,10€ mln)